Search Grants — Free, No Account Required
Search federal, state, and foundation grants by keyword, state, or focus area. When you find a match, apply with our AI-assisted application builder.
1,351 grants foundClear search
24 grants worth up to $11.6M match your search
Enter your email to see grant names, funders, and application links
Towards activism
openWasat Community
On the September 25th, Dawud Walid, an African American Muslim scholar, will guide South Seattle's Muslim community in discussion and dialogue on social justice and activism with the cultural perspective of Muslims. The event will be held at Rainier Arts Center, located at 3515 S Alaska St at 7pm. Wasat will follow up the next day by implementing a service project for community youth to distribute nourishing free meals made from surplus produce to those facing food insecurity.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Traffic calming - Meridian-Corliss-Burke
openMeridian Coalition
The Meridian Coalition will hire a consultant to conduct a traffic study of the area between Wallingford Ave N and I-5 and between N 85th St and N 92nd St. The goal is to calm traffic and improve pedestrian safety. Two community meetings and street walks will be held. The study and design will be completed by early 2019.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Traffic calming on 42nd Ave S
openFriends of 42nd Ave S
The Friends of 42nd Avenue South will work with SDOT and a landscape architect to gather speed and volume data and design pedestrian safety and traffic calming improvements along 4400-4600 blocks and 5000-5200 blocks of 42nd Ave S. Community meetings and site walks will also be held. The project will be completed by March 2018.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Traffic Calming Study
openSlow Your Roll 31st Ave NW
Conduct a traffic study on 31st Ave NW measuring traffic volume and speed. This information will be used to determine if further traffic calming measures are necessary.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Traffic Circle at 26th Ave E & E. Mercer St
openMadison Valley Parents & Neighbors for Calmer Streets
Madison Valley Parents & Neighbors for Calmer Streets will install a traffic circle at the intersection of 26th Ave E & E Mercer streets. SDOT will construct the traffic circle, and community volunteers will landscape the circle. A community celebration of the newly built and landscaped traffic circle will be held in August 2018.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Traffic speed reduction for 500-700 28th Ave E
open28th Ave E Neighbors
The 28th Ave E Neighbors community group will narrow the roadway along the 500-700 blocks of 28th Ave E to slow vehicle traffic and increase pedestrian safety. SDOT will install wheel stops, and the 28th Ave E Neighbors will install topsoil, gravel, and plants as landscaping in the right-of-way adjacent to the roadway. Work will be completed by May 2019. A community celebration along the blocks will be held in May 2019.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Transit Security Grant Program (TSGP)
openFederal Emergency Management Agency
Grants to owners and operators of transit systems to protect critical surface transportation infrastructure and the traveling public.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Traumatic Brain Injury State Partnership Program
openAdministration for Community Living
Grants to states to improve access to health and other services for individuals with traumatic brain injury and their families.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Tree plantings on 20th Ave
openFriends and Neighbors of Mt Zion Baptist Church
The Friends and neighbors of Mt Zion are coming together to increase tree coverage in their neighborhood. On May 17, 2025, the new plantings will take place 20th Avenue between E Olive Street and E Pine Street. The plantings will include, 6 new Cherry Akebono trees, 4 new Carpinus japonica. Bushes and ground cover will also be planted to retain humidity and create natural separation through planters between tree area and transit area to avoid damage by vehicles driving over the curb, or people/dogs walking over plants. The project is free and open to the public.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Tribal Youth Program
openOffice of Juvenile Justice and Delinquency Prevention
Grants to federally recognized tribes for juvenile justice, delinquency prevention, and mental health programs for tribal youth.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Troll's Knoll Art and Design
openFriends of the Troll's Knoll
The Friends of the Troll's Knoll is a community group dedicated to promoting and strengthening the safety and security of the community by maintaining and activating the green space right-of-way on the east side of the Fremont Troll, located at N 36th St and Winslow Pl N Seattle WA 98103 and turning it into a public park. The group will hire a designer to create a design plan for the space and hire an artist to create and install artwork. The anticipated end date for the project is August 31, 2020.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Troll's Knoll Art and Design Part II
openFriends of the Troll's Knoll
The Friends of the Troll's Knoll (FOTK) is a neighborhood group dedicated to engaging the community in beautifying and activating the urban forest around the Fremont Troll. This grant will fund: (1) site survey of the land, (2) arborist analysis, (3) detailed planting plan, (4) installation of a willow art feature, (5) addition of a Japanese style shade structure, known as a hokora, and to the existing moss turtle artwork (installed by us in 2020). The anticipated project close out is May 31, 2022
Free to search & build · $99 one-time to unlock the application pack · No subscription
Troll's Knoll Forest Physical and Artistic Improvements
openFriends of Troll's Knoll
The funding will cover benches, decommissioning of the damaged Mushroom Lantern sculptures (funded by DON in 2021), replacement art with stainless steel sculptures, and erosion control. Currently, we do not have seating for mobility impaired visitors and would like to purchase and install sturdy horizontal basalt column benches. Our site is open 24/7 and free and open to the public. The anticipated project completion date is December 31, 2026.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Tulip Planting in Denny Park!
openSouth Lake Union Chamber of Commerce
Friends of Denny Park, in collaboration with the South Lake Union Chamber of Commerce will plant approximately 8,250 tulip & daffodil bulbs in Denny Park at 100 Dexter Avenue North on Saturday, September 29th at 1:00 p.m. These bulbs will bloom in the spring of 2019 bringing much needed color and vibrancy to Seattle's most historic park. The flowers will be planted primarily at entrance points, along paved pathways and in planters around the center gathering plaza. This project will be completed by October 31, 2018.
Free to search & build · $99 one-time to unlock the application pack · No subscription
Two Cranes Institute Streetscape Improvements
openTwo Cranes Institute
Two Cranes Institute (TCI) purchased their building located at 8512 20th Ave NE in 2016 to secure a home and explore partnerships that could support a community gathering space. TCI's Streetscape Improvements project will remove tree stumps from the crumbling sidewalk which has become hazardous and falls short of ADA requirements. After replacing the sidewalk, TCI will install landscaping, a patio reconnecting community pathways and create welcoming areas for people to gather. This project will be completed by June 30, 2023.
Free to search & build · $99 one-time to unlock the application pack · No subscription
U District Community Mobility Vision Plan
openU District Advocates
The U District Advocates will coordinate a series of community meetings that will include key stakeholders from the community, city, university, and transportation agencies over the next 6-8 months as partners to design a Mobility Vision Plan that will include a comprehensive, equitable, and efficient approach to mobility in the U District community.
Free to search & build · $99 one-time to unlock the application pack · No subscription
U District Green Street Summer Activation
openU District Advocates
During this summer (June-October), we will build out our proposed Green Street as a prototype to test public responses to the improvement strategies from the completed conceptual plan to make NE 42nd Street safer and more pedestrian-friendly. This 'tactical urbanism' project will set the stage with outdoor seating, temporary trees in planters, traffic calming, play structures, and pavement painting, phased in over a series of weeks.
Free to search & build · $99 one-time to unlock the application pack · No subscription
U District Mural Program
openThe U District Partnership
The U District Mural Program is an initiative to build vibrancy in Seattle's University District by adding new works of public art. Murals will be installed in the following locations: 1313 NE 42nd Street, 1319 NE 43rd Street, and 4261 Roosevelt Way NE. This project will be completed by August 31, 2021.
Free to search & build · $99 one-time to unlock the application pack · No subscription
U District, Seattle's most walkable neighborhood
openU District Advocates
The U-District Advocates group will initiate a community led conceptual to 10% design plan of two blocks NE 42nd St as walkable core of the neighborhood, and to implement strategies on the designated `Green Street` This project is a partnership and takes place in the University District in the 1400 NE 42nd St area. The project is free and open to the public, and will be completed in the Spring of 2023.
Free to search & build · $99 one-time to unlock the application pack · No subscription
U-Heights Elevator Installation Projects Support
openUniversity Heights Center
University Heights Center (UHeights) located at 5031 University Ave NE. Has started construction on an elevator shaft to link all 4 floors of our 55,000 square foot building. This project supports projects associated with their Elevator Installation. In turn giving the community unbarred entry to all classroom and event spaces. The project is free and open to the public. The project is expected to be completed in early Spring of 2022.
Free to search & build · $99 one-time to unlock the application pack · No subscription
UDFB Anaerobic Digester Project
openUniversity District Food Bank
The University District Food Bank will install an anaerobic digester at the food bank (5017 Roosevelt Way NE) by May 2019 to lessen food waste and provide free compost to neighborhood P-Patch gardens. A public meeting will be held to collect input on how to best use the digester as an educational tool for the community. Community members will also participate in building the anaerobic digester by May/June 2019. Free monthly community workshops about anaerobic digestion, public health, and renewable energy will be offered on an ongoing basis.
Free to search & build · $99 one-time to unlock the application pack · No subscription
FindGrants Pro
Save unlimited matches with FindGrants Pro — $19/mo
Includes 1 application credit per month, weekly emailed grant alerts matching your org, and deadline reminders. Cancel anytime.
Found a grant that fits? Get matched to even more.
Answer a 2-minute questionnaire and our engine scores every grant in the database against your organization — surfacing opportunities you might miss browsing manually.
Get Personalized Matches — Free